PBS

Impossible Builds

The Team Stumbles Upon a Problem Inside the Building

Clip: Episode 1 | 2m 38s

Loading Player...

The Scorpion Tower’s head of interiors, Mark Morabito, must conduct a floor-by-floor inspection of the building every day. However, due to the build’s unique curved design, no two floors are the same, and it’s during one of these inspections that Mark spots an alignment issue with the lights and sprinklers.

Aired: 02/07/18 | Rating: TV-G

Watch Full length

More Extras From This Episode

See all Extras

More Episodes

See all Episodes

More Culture Shows

Browse all Culture Shows

Sign into PBS

By creating an account, you acknowledge that PBS may share your information with our member stations and our respective service providers, and that you have read and understand the Privacy Policy and Terms of Use.

Confirm Your Local Station

To help you find your favorite shows and great local content, we've selected a PBS station in your area.

Please confirm that WETA is your preferred local station, or choose another station below.